OPGW Preformed Tension Clamp
video
OPGW Preformed Tension Clamp

OPGW Preformed Tension Clamp

Tension Clamp for OPGW Fiber Optical Cables is used for OPGW terminal fixation. It is designed for two layers of structural reinforcing rods and tension rods can distributed the axial load and radial pressure is evenly, to minimaize the impact on the optical unit. It has excellent anti fatigue properties.
OPGW Preformed Tension Clamp

 

Tension Clamp for OPGW Fiber Optical Cables is used for OPGW terminal fixation. It is designed for two layers of structural reinforcing rods and tension rods can distributed the axial load and radial pressure is evenly, to minimaize the impact on the optical unit. It has excellent anti fatigue properties.
This kind of clamp is used for connection between cable and linear support or support with corner or elevation angle more than 25°.
The concrete configurations: For terminal pole/tower-one to one; for strain/splicing/corner pole/tower -two to one.

 

Feature

 

a. According to OPGW cable rated tensile strength and diameter to select the appropriate Clamp.
b. The number of configurations: one set / Terminal Tower (including gantry); 2 sets / Tension tower.
c. The lay direction of inner twisted wire is opposite with lay direction of the outer twist wire, the standard configuration: Lay direction for OPGW outer twisted wire is right, If left, it should be specified in the order contract.
d. The clamp afford a full tension, it was proposed to use one-time.
e. Provide the model type for the first tower connected with the fittings.
f. Clamp strength is divided into 70kN, 100kN, 120kN and so on.

 

Technical Sheet

 

image007

 

FAQ

 

Q: Where is your factory located? How can I visit there?

A: Our factory is located in Jining City, Shandong Province, China. We welcome everyone to visit our factory.

Q: How can we guarantee quality?

A: Always a pre-production sample before mass production; Always final Inspection before shipment.

Q: What's your delivery time?

A: Normally, our delivery time is 15 days after received deposit,it base on the quantity of the order.

Q: What's your payment term?

A: We accept T/T, L/C,Western Union. Other payments accept through negotiation.

 

Hot Tags: OPGW preformed tension clamp, China OPGW preformed tension clamp manufacturers, factory, OPGW Cable Storage, Tuning Fork Vibration Damper, Square Yoke Plates, OPGW Strain Clamp, Fastening Fixture, Preformed Double Suspension

Send Inquiry